How to Get a New Electricity or Gas Connection

Documents, fees and timelines — and the one warning to read before you pay anything.

A new domestic electricity connection is applied for online through the ENC portal or on a free paper form at the sub-division office, and ends with a demand notice and a meter installation. A new gas connection is a different story: it is only given on imported RLNG tariff now, and whether applications are even open is disputed. Both are explained below.

Not a government website. The binding figure for any connection is always the demand notice your company issues after inspection — never a figure from a website.

New electricity connection

Who needs it: the owner or tenant of a premises with no existing connection, or anyone needing a second meter or a load extension.

Documents needed

Source: NEPRA Consumer Service Manual (revised 26 Nov 2025), clause 2.3, as read in dated secondary sources.

Steps

  1. Apply at enc.com.pk (it serves LESCO, GEPCO, PESCO, HESCO, SEPCO, QESCO, TESCO and HAZECO; IESCO, FESCO and MEPCO have their own ENC portals or apps) or on the free form at the sub-division office. Keep the tracking ID or acknowledgement receipt.
  2. Site inspection and load sanction. A demand notice (DN) is issued — pay only the DN amount, at the designated bank or through ENC "Pay DN", within 30 days (a further 30 days' grace may be allowed).
  3. Sign the power supply contract in triplicate after payment. The DISCO then installs and seals the meter and energises the connection.
  4. Timeline (NEPRA manual, Annexure III): 30 days from registration to meter for loads up to 15 kW; 44 days for 15–70 kW.

Fees — electricity

Security deposit (residential, urban)Rs 1,220/kW — for example, a 5 kW urban home pays Rs 6,100
Security deposit (residential, rural)Rs 610/kW
Connection chargesActual material cost at store issue rate + 12% store handling + 8% installation on that subtotal — site-specific, no fixed total exists

The deposit rates are from the NEPRA manual (Annexure IV), notified by S.R.O. 04(I)/2011 and still charged. The deposit is refundable when the connection is permanently removed with no dues outstanding, within 30 days of the request. Note that in February 2025 NEPRA heard DISCO petitions to raise deposits many times over (LESCO asked for Rs 19,272/kW urban) and withheld its decision pending audit — so deposit rates could change; re-check before applying. Total meter cost: no verified total exists. One blog quotes around Rs 21,300 for a standard single-phase connection, but that figure is not from LESCO or NEPRA and is not corroborated, so we do not publish it — the demand notice after inspection is the only binding figure. K-Electric has its own schedule of charges (not ENC); new KE connections go through ke.com.pk or the KE Live app.

New gas connection (SNGPL / SSGC)

Who needs it: households in Punjab, Khyber Pakhtunkhwa, Islamabad and Azad Kashmir (SNGPL) or Sindh and Balochistan (SSGC), where a gas main already runs in front of the house.

Read this before paying anything. November 2026 news reports say new domestic gas connections are suspended, while SNGPL's own website still shows a "Resumption Of Domestic Gas Connections" notice for RLNG. The two do not agree. Confirm with SNGPL helpline 1199 or your local office that applications are being processed before you pay any fee — including the Rs 25,000 fast-track fee.

Documents needed

Steps

  1. Confirm a gas main runs in your street. If not, a separate network-extension form is needed.
  2. Apply online at sngpl.com.pk ("Apply for New Connection" under Online Services) or through the ConnectOn app, or in person at a regional office. Choose Normal Merit or Fast Track.
  3. Keep the acknowledgement receipt.
  4. Site survey, then a demand notice or proposal letter, a house-line plan and a list of registered contractors.
  5. Pay at the named bank; the service line is laid and the meter installed.

Fees — gas (SNGPL, from SNGPL's own site as read 14 Nov 2026)

ApplyingNo fee
Up to 10 marlaService line Rs 1,500 + refundable security Rs 20,000 = Rs 21,500
Above 10 marlaService line Rs 3,000 + security Rs 20,000 = Rs 23,000
Fast Track (optional, on top)Rs 25,000. Same form for Normal Merit and Fast Track.

SNGPL notes OGRA may change these charges — check the challan before paying. For SSGC (Sindh and Balochistan), secondary readings of SSGC's online page (8 Nov 2026) quote: up to 10 marla or 300 sq yd — Sindh Rs 22,725, Balochistan Rs 21,725; over 10 marla — Sindh Rs 24,450, Balochistan Rs 23,450 (the Sindh total includes Rs 1,000 stamp duty). These SSGC figures were not opened directly from ssgc.com.pk, so treat them as secondary. Important: a new connection gets RLNG at a flat rate, not the slab-wise system-gas rates — it is usually costlier. Old applicants who paid under system gas pay a differential (Rs 15,500 where Rs 4,500 was already deposited, to reach the Rs 20,000 security). The reported backlog is 700,000+ applications; normal processing is reported at 2–3 years and fast track at 6–12 months — neither is a guaranteed date.

Common mistakes

Frequently asked questions

How long does a new electricity connection take?

Under the NEPRA manual, 30 days from registration to meter for loads up to 15 kW, and 44 days for 15–70 kW. The demand notice must be paid within 30 days, with a further 30 days' grace sometimes allowed.

Is the security deposit refundable?

Yes — when the connection is permanently removed and no dues are outstanding, the deposit is refunded within 30 days of the request.

Can I get a new gas connection on cheap system gas?

No. New domestic connections are only on imported RLNG tariff, charged at a flat rate rather than slab-wise. System-gas connections remain banned for new applicants.

What if there is no gas main in my street?

You need a separate network-extension form first. Applying for a connection alone will not bring the main to your street.

Roman Urdu: Naya bijli connection ENC portal (enc.com.pk) se apply hota hai — CNIC, property proof, parosi ka bill aur wiring test report tayyar rakhen. Security deposit shehri ilaqon me Rs 1,220 per kW hai. Gas connection sirf RLNG par milta hai, aur koi bhi fee dene se pehle 1199 par confirm kar len ke applications khuli hain ya nahi.

نیا کنکشن لینے سے پہلے ڈیمانڈ نوٹس اور فیس خود چیک کریں