PoochloPOOCH LO. KAAM HO JAYEGA.

Home › Net metering guide

Net Metering and Net Billing — the Complete Guide

How to apply, what it costs, and what your exported solar is really worth now.

Since 9 February 2026 there is no net metering for new users — only net billing. Imports are billed at the applicable consumer tariff, exports are credited at the national average energy purchase price, and the two are netted in rupees each 30-day billing cycle — not unit for unit. Old (pre-9 February 2026) agreements keep the old billing until expiry, then move to net billing on renewal.

Not a government website. This guide explains NEPRA's (Prosumer) Regulations 2026, S.R.O. 251(I)/2026; your DISCO's net-billing agreement is the authority for your connection.

For the rules in short form, see our net billing explained page; this guide is the step-by-step version — documents, deadlines and fees.

Who needs it

Any 3-phase 400V or 11kV consumer — domestic, commercial, industrial, agricultural, general services or bulk supply — wanting rooftop solar, wind or biogas connected to the grid.

Documents and requirements

From S.R.O. 251(I)/2026, Schedule II form:

Steps — and the deadlines your DISCO must meet

These deadlines come from Regulation 3 of the Regulations:

  1. The DISCO must give you the forms free within 2 working days.
  2. Submit the form. The DISCO acknowledges it within 5 working days and lists anything missing — you then have 3 working days to supply it.
  3. Initial review within 15 working days (reasons for infeasibility within 3 working days after that).
  4. Agreement signed within 7 working days.
  5. Connection-charge estimate within 7 working days of the agreement; pay it within 7 working days.
  6. The DISCO installs and commissions the interconnection, including the bidirectional meter, within 15 working days of payment of the demand notice.

Billing starts on NEPRA concurrence — except for systems of 25 kW or below, where concurrence is no longer needed (see the fees section).

Fees and key figures

Export creditRs 8.13/unit — the national average energy purchase price (NEPRA decision on the CPPA-G power purchase price forecast for CY2026, para 36, 7 Jan 2026). Reg. 14(3) lets NEPRA revise the rate by notification during the agreement, and it is reset with each annual forecast — do not treat Rs 8.13 as locked for five years.
Agreement length5 years from the date of commissioning, renewable for further 5-year terms by mutual consent (Reg. 7(1)). The old 2015 regime was 7 years.
Size limitUp to 1 MW, and never above your sanctioned load (Reg. 2(1)(ix), Reg. 3(2)).
Transformer limitThe DISCO must not accept an application if the distributed generation already connected to that distribution transformer has reached 80% of its rated capacity (Reg. 3(5)).
NEPRA concurrence feeNil at 25 kW and below; Rs 1,000/kW one-time above 25 kW (S.R.O. 709(I)/2026, 28 Apr 2026, backdated to 9 Feb 2026).
NEPRA approvalNot needed at 25 kW or below since S.R.O. 1330(I)/2026, 6 Aug 2026. Some reports cite the same notification as S.R.O. 1320(I)/2026; the file on NEPRA's server is named S.R.O. 1330(I)-2026, so we quote 1330.
DISCO interconnection / metering costPayable per the DISCO's estimate — the amount is site-specific and no fixed figure is verified.
Surplus creditIf the export value exceeds the import value in a cycle, the net amount is credited to the next cycle or paid quarterly by the licensee (Reg. 14(2)).

What about old net metering agreements?

If your agreement predates 9 February 2026, you keep the old billing — exports credited at the national average power purchase price, about Rs 25.32/unit — until the agreement expires, then you move to net billing on renewal. But modifying your system (for example increasing its size) can be treated as a new connection and move you onto net billing. Check with your DISCO before changing anything.

Common mistakes

Before you buy panels, work out the size and payback with the solar calculator — under net billing, a system sized far beyond your daytime use pays back slowly, and storing your own solar for the evening often beats selling it at Rs 8.13.

Frequently asked questions

Is net metering still available in Pakistan?

No — for new connections, net metering ended on 9 February 2026. New users get net billing under S.R.O. 251(I)/2026: exports are bought at Rs 8.13/unit and imports are charged at the full retail tariff, netted in rupees each billing cycle.

How much will I be paid for the electricity I export?

Rs 8.13 per unit, the national average energy purchase price. The rate can be revised by NEPRA during your agreement and is reset with each annual power-purchase-price forecast, so it is not locked for five years.

Do I need NEPRA's approval for a home solar system?

Not for systems of 25 kW or below — since S.R.O. 1330(I)/2026 (6 Aug 2026) the DISCO itself accords approval, and the concurrence fee is nil. Above 25 kW, a one-time fee of Rs 1,000/kW applies.

What happens to my surplus credit?

If in a billing cycle your exports are worth more than your imports, the net amount is credited to the next cycle or paid to you quarterly by the licensee (Reg. 14(2)).

Roman Urdu: 9 February 2026 ke baad naya solar connection sirf net billing par milta hai — bijli bechne par Rs 8.13 per unit milta hai, jabke khareedne par poora retail rate lagta hai. Is liye system apne din ke istemal ke mutabiq lagayen. 25 kW tak NEPRA ki approval ya fee ki zaroorat nahi.

سولر لگانے سے پہلے نیٹ بلنگ کے اصول سمجھیں